Wind turbine towers transport trailer
Wind turbine base ring, towers, nacelle, hub and blades, wind turbine height of 70 meters, diameter of 4 meters at the bottom, upper 3.5 meters. A single fan unit more than 120 tons of cabin mounted on the Tower, cabin storage generator unit. Blade length 43.5 m, rotor diameter up to 89 m, the cabin weighs 60 tons, single Tower is 24 meters long and weighs 41 tons, during transport on road requirements are high, especially for turn RADIUS and grade requirements. Large wind turbine components, Plains transportation vehicles can be completed, but encountered trees, mountains will increase the difficulty of transportation!
Wind farm construction process traffic large, Tower wind turbine blade and the most representative. A single wind turbine tower weighing more than 100 tons, weight dispersion of transport back, flatbed trailers for the transport of drivers in front, walking uphill, leaning tower focus, not to the driving wheels by exerting effective pressure, trailers don't produce enough traction. Solution to the problem can only be controlled below 12 degrees as possible road
gradient.
43.5 m windmill blade
trailer, you must use the special mountain truck fan blade. The trailer plate almost 14 metres in length, vehicle length of 17 metres, it can lift into horizontal blade tilt ≤ is 60 degrees. During transport, can also make wind turbine blades around the turntable rotates 360 degrees from the center of the plate. By blade lifting, rotation, can effectively avoid obstacles along your way. So that the fan blade transport vehicles pass, reducing the owner's demolition costs, such as building roads through mountains to fell trees, also reduced the scope of extension widen the road.
没有评论:
发表评论