2015年4月8日星期三

Sand control techniques of samll Casing in shengli oilfield

In the current dire circumstances of low oil prices, full use of the existing old oil fieldshengli oilfield casing wells resources, meticulous research, scientific rational layout design, a number of side-tracked, implement overhaul in new measures such as tapping the potential of remaining oil in mature oilfields has become important, Eor, savings bonds effective means.

Casing in shengli oilfield oil well sand control techniques, as the oil production plant of "Twelve-Five" during the major scientific research projects. At present, the oil field there are small casing wells 78, including trades the small casing sidetracking wells, overhauled wells. In recent years, this oil field technicians for small sand casing technical difficulties of the Institute, after tireless research, evolved for different reservoir types and different sand control technique of series of well conditions.
Dongying on the one hand small span of mechanical sand control technology of sand well matching mode. First, for different casing diameter, formed has PFS filling tool series, can meet minimum diameter for 82 mm small casing of anti-sand needs; second, in quartz sand specifications and around silk screens design aspects, on quartz sand specifications, and around silk screens od and the sieve sewing size for has optimization, both guarantee has oil sets ring empty has must of radial thickness, and meet has anti-sand hòu small rushed tube anti-cycle flush fish cavity processes, improve has ring empty block sand wall of reliability; addition in construction process shàng, according to different reservoir features and wells condition conditions, Hermetic filling processes, such as filling, reverse circulation, through optimization of construction parameters such as displacement, sand-carrying more than, an effective solution to the ring space "bridging" risks, improve the reliability of a sand barrier.
Is the multiple layers, on the other hand sand control technology in large span well layered model. First, developed success achieved has different casing diameter layered construction seal across device series, site practice proved, the series seal across device seat seal reliable, and bearing pressure level high, completely can meet site construction of requirements; second, construction process take paint sand layered pre filling, and low concentration resin "sealing" construction process, guarantee has near wells block sand barrier has high strength; addition, through theory calculation, obtained different shot hole way and wells diameter conditions xià wells theory mining liquid strength, for further extended anti-sand validity lay has based.
At the end of March, casing wells in shengli oil field this year have been implemented little mechanical sand control in 3 wells, paints sand-resin sand 4 + times, success rate of 100%, technological measures efficiency of 92.7%, has been increased to more than 1200 tons of oil. Casing the well sand control technology is getting more mature, victory has become of increasing oil production plant processes, measures of tapping "weapon".

没有评论:

发表评论