- After the completion of concrete placement,concrete placing boom must use products and clean water will clean the pump tube, each time pumping water when cleaning, spray balls must use scales should not be used instead of other objects, after cleaning, lifting weight, hanging fabric shaft after work to the next location, once it is installed, into the stack, repeating previous work.concrete placing boom are not allowed to take a long, take a long, in addition of fixed radius greater than promised work required support.concrete placing boom is straight and see if it is in the case of no counterweight is straight. (Boom under normal circumstances consider as not counterweight can be straight, because when the lifting boom, General tower crane boom and counterweight cannot be lifted, lifted up again and have to install).
2015年4月22日星期三
Considerations for concrete placing boom
订阅:
博文评论 (Atom)
没有评论:
发表评论