Drilling engineering construction, pantomime not interrupted of produced life garbage, and production waste, to job around environment vegetation caused different degree of damage, on production life sewage emissions, cycle again using while, specification storage liquid pool standard, laying thickness not below 0.7 mm geo film a layer, anti-infiltration plastic sheeting a layer; edge with sandbags surrounding side, placed close, in from storage liquid pool appropriate location playing monitoring wells 2 mouth, timing monitoring groundwater not by pollution, ensure sewage drip not leakage.
Equipment bottom laying geo film, and pad steel cover them, using in the of drilling tool placed neatly, placed not should over three layer, drilling tool above not placed debris, silk buckle clean, drill pipe frame edge has anti-slipped device, ends below laying geo film, with party steel surrounding side; alternate drilling tool store separate, site placed all drilling tool ends with plastic sheeting dressing, with tarpaulin covered, following again laying geo film; construction in the mud drug, and equipment, and drilling tool overall and ground not contact, unified distance ground 10cm height Nearby stormwater drainage grooves and set uniform standards, through the Flume the possible rain into the liquid storage tank.
All solid waste to the site causing damage to the environment, prohibits landfilling burn classification standards establish the waste removal account, by environmental professionals a unified centralized harmless treatment.
没有评论:
发表评论